Quoted Text
I'm looking forward to what your decisions will be, and how you go about the needed modifications.
Well I won't keep you waiting Joel!
First up, chose a spot and chop chop!

I have a decent selection of Evergreen sheet and profile on hand, so I dug around and found a sheet with the same thickness as the chassis rails, then cut some strips to fit neatly inside the C-section. I decided to put a 40mm extension (960mm in 1:1) on the chassis, so I cut two 40mm spacers and two inner reinforcements to overlap into the chassis by 20mm each end, then cemented them together.


A little curing time, then these spacers were fixed into place on the chassis.


While this was curing I cut some 3.2mm angles to length to fit neatly between the existing cross members, and then cemented them into place top and bottom.

Once again a bit of curing time sitting on a flat surface, then checked for alignment and twist, and it seems to have held up very nicely.


The chassis extension is now supported inside and out, top and bottom, and should handle the weight of both the wedge tray and the car kit sitting on top of it.
All up, this took about an hour and I'm happy with the result.
Next up, a light sand to clean up the profiles, then use the original kit tailshaft, from the differential forward, to locate the position of the "pillow block" so kindly detailed by Mike. I will then scratch build a cross member and pillow block, and a short front tailshaft to extend the drive train forward to the transmission.
Cheers, D